INSTALLATION AND MAINTENANCE

Air intake filter location

Oil filter
Drain location for changing oil Location for filling with oil
1, 2 and 3 are 220/240v 60hz, three phase for the main motor.
4 and 5 are 220/240v and are for the dryer. The machine's main ground is 6.
(the above information is for all machines purchased from Owl Engineering before Aug 20, 2026)
Electrical work requires a qualified electrician
When first starting the compressor the rotation must be in the direction of the arrow Easy to read tank pressure
Direct drive to Baosi pump Oil reserve with sight glass
Most panels have sound deadening material Included:  One set of filters for your first oil change at 500 hours

  